JT RecTec eTurner E530

  • Energy-efficient performance: class A+ (0.05 kWh/m³)
  • Large-scale composting with a capacity of up to 3,000 m³/h
  • Hopper dimensions up to 5.3m for more compostable material
  • Remote-controlled
  • Accelerated composting with 0-170 rotations per minute

Description

JT RecTec eTurner E530: fully electric compost turner for large-scale composting

Are you looking for a durable, high-capacity compost turner? The JT RecTec eTurner E530 is the first fully electric compost turner, ideal for large-scale composting operations. This powerful machine accelerates the composting process and helps you produce high-quality compost in an environmentally friendly manner.

Why choose the eTurner E530?

  • Fully electric: emission-free and energy-efficient
  • High capacity: up to 3,000 m³ per hour
  • Large swath width: up to 5.3 metres and a cross-section of up to 7 m²
  • Secure remote control: no cabin or operator required
  • Compact transport size for easy moving

Efficient composting without emissions

With a drum diameter of 1,200 mm and a rotation speed of 0-170 revolutions per minute, the eTurner E530 ensures optimal aeration and mixing of compost heaps. The electric drive guarantees quiet operation with zero emissions, contributing to a more sustainable working environment.

Practical dimensions and flexible in use

The eTurner E530 is designed for use at large-scale composting sites, with dimensions of approximately 4,300 mm (length) x 5,430 mm (width) x 2,730 mm (height) in working position. Thanks to its compact transport position, the machine is easy to transport between sites.

Suitable for various applications

Whether you are composting organic waste, green waste or other compostable materials, the eTurner E530 offers a reliable solution for any large-scale composting project. For smaller applications, the more compact eTurner E380 is also available.

Are you curious about the possibilities of the eTurner E530 or would you like to see the machine in action? Contact our representatives for no-obligation advice.

 

 

Road closure alert!

Next Monday 12 August Our location will be inaccessible between 12:00 PM and 3:00 PM due to the passage of the Tour de France Femmes. The Stationsweg will be closed during this time. We welcome you before 12:00 PM or after 3:00 PM. Thank you for your understanding.