Keestrack P3

  • Capacity up to 100 tons/hour
  • Two-shaft shredder with 90,000 Nm torque
  • Suitable for construction waste, biomass and metal
  • 45° tiltable loading platform

Description

Keestrack P3 Shredder: compact and powerful two-axle shredder

The Keestrack P3 tracked shredder is a compact, versatile, and highly efficient two-shaft shredder, suitable for processing a wide range of materials. Thanks to its robust construction and flexible configurations, the P3 can be employed for applications such as construction waste, wood waste, biomass, and light metal scrap. The diesel-hydraulic drive offers reliable performance, while the maintenance-friendly components minimise downtime.

Key features:

  • Capacity: up to 100 tonnes per hour
  • Inlet opening: 1.589 x 1.200 mm
  • Two-shaft shredder: shaft diameter 700 mm, with a torque of 90,000 Nm per shaft
  • Tilting loading platform: 45° tiltable for easy feeding
  • Maintenance-free bearings: for longer service life and lower maintenance costs
  • Track drive: maximum mobility with a speed of up to 2.5 km/h

Flexible and powerful

The P3 offers various configuration options with different sets of shafts and screen meshes to adapt the machine to specific materials. Thanks to the automatic unlocking system, jammed materials are easily removed by reversing the direction of rotation of the shafts.

Applications

The P3 shredder is suitable for processing:

  • Construction waste
  • Inorganic waste
  • Biomass and green waste
  • Stems and roots
  • Wood waste and plastic
  • Light metal waste and tyres

Advanced technology and ease of maintenance

The P3 is equipped with a radio remote control, making it easy to operate the machine from a safe distance. Thanks to the tiltable loading platform and easy access for maintenance, the machine is ready for a new set of axles or sieve screens within one hour. The 50mm-opening post-screen ensures a consistent final product.

Would you like to know more about the Keestrack P3 shredder? Contact our representatives for advice with no obligation.

 

Road closure alert!

Next Monday 12 August Our location will be inaccessible between 12:00 PM and 3:00 PM due to the passage of the Tour de France Femmes. The Stationsweg will be closed during this time. We welcome you before 12:00 PM or after 3:00 PM. Thank you for your understanding.